This is the Dell Logo This graphic produces space between objects Buy Online or Call 1-800-WWW-DELL 
Dell PowerEdge 2650
This graphic produces a rounded corner This button takes the user back to the previous pagePrevious   NextThis button takes the user to the next page.
This is a placeholder for Dell's Customer Training logo
IndexThis is an arrow pointing right
Course OverviewThis is an arrow pointing right
Product OverviewThis is an arrow pointing right
Chassis This is an arrow pointing down
Bezel
Removing the Cover
Accesssing the Fans
Racking
Cable Management

Virtual Hands-On
Chassis 360º
Chassis Teardown
System BoardThis is an arrow pointing right
Power SubsystemThis is an arrow pointing right
Processor TechnologyThis is an arrow pointing right
Chipset TechnologyThis is an arrow pointing right
Memory TechnologyThis is an arrow pointing right
BackplaneThis is an arrow pointing right
Integrated DevicesThis is an arrow pointing right
BIOS TechnologyThis is an arrow pointing right
SoftwareThis is an arrow pointing right
TroubleshootingThis is an arrow pointing right
Review MaterialsThis is an arrow pointing right
Course Feedback
Contact Dell

Dell PowerEdge 2650

Cable Management

The PowerEdge 2650 supports a newly designed cable management arm similar to the one used in the PowerEdge 1650. The cable management arm is used to route the cables from the back of the server to the cable routing channels in the 4-post rack. The new design is intended to simplify the installation procedure by eliminating the need to use velcro straps to secure the cables in place. Instead, you can simply lay the cables down inside the cable management arm. A detailed description of how to install the cable management arm is provided below.

IMPORTANT - More Information   NOTE: The racking and cable management steps are listed separately for clarity in this course. In an actual PowerEdge 2650 installation, the cable management installation process should begin after Step 4 of the racking instructions found on the previous page.

The following procedure outlines the process for installing the cable management hardware for the PowerEdge 2650.

 Installing Cable Management Hardware

Step 1: Push the tab on the back end of the cable-management arm into the latch on the end of the slide assembly. The latch clicks when locked.
This is a picture of the tab on the back end of the cable-management arm being pushed into the latch on the end of the slide assembly
IMPORTANT - More Information NOTE: The cable-management arm can only be installed on the right side of the rack cabinet (as viewed from the back).


Step 2: Push the tab on the front end of the cable-management arm into a mating latch on the inner segment of the slide assembly. The latch clicks when locked.
This is a picture of the tab on the front end of the cable-management arm being pushed into a mating latch on the inner segment of the slide assembly

Step 3: Install the plug for the system status indicator into the proper connector.
This is a picture of the system status indicator cable being plugged into its connector

Step 4: Open the wire covers on the cable-management arm. The wire cover swings open to enable cables to be routed within the arm.
This is a picture of the cable management wire cover

Step 5: Route the system status indicator end of the cable through the cable-management arm, and install the indicator in its slot at the back end of the cable-management arm.
This is a picture of the indicator in its slot at the back end of the cable-management arm.

This graphic, located at the bottom of the page, includes navigation buttons allowing you to return to the Previous page, or continue to the Next page. The Previous button is on the left, and the Next button is on the right. Text links are available at the top right of the page.